Project management for the production and transport of an exchange boat landing for the HelWin Alpha transformer platform.

Project goal:
Restoration of accessibility to the HelWin Alpha transformer platform after the existing boat landing was damaged by a supply ship during a mooring manoeuvre and access was only possible via a jack-up barge.

Client: mh² Offshore GmbH, TenneT Offshore GmbH

Category: Windkraft, Projekt-Management

Project period: 03/2020 – 06/2020

Projekt-PDF deutsch
Project-PDF english

Client:
mh² Offshore GmbH is a service company with a focus on steel construction and welding technology in offshore wind energy based in Loxstedt-Stotel (Germany).

TenneT Offshore GmbH (owner) is a subsidiary of the German transmission system operator Tennet, founded in 2009, based in Bayreuth (Germany).

Part of D.E.S.

  • Project management in steel construction, responsible for compliance with project goals
    (deadlines, costs, quality and HSE)
  • Creation of weekly reports, schedules and cost overviews
  • Single point of contact with the customer
  • Claim management including communication with sales, purchasing, manufacturing and the QA department
  • Participation in regular internal communication
  • Document management
  • Acceptance at the Supplier